Ridgeline Cold Storage
Service upgrade, MCC installation, ammonia compressor feeds
Sq Footage
84,000 sq ft
Completed 2024
Site Survey
Conducted comprehensive site survey to document existing 208V service limitations, identify load centers, and photograph all panel locations before shutdown planning.


Existing 800A, 208V service — undersized for compressor expansion
Field Documentation
NEC 230.42 — Service conductors sized for 125% of calculated load. Existing service confirmed non-compliant for new compressor additions.
Free Resource
Pre-Project
Checklist
10 items every facility manager should verify before an industrial electrical project begins. Prevents the three most common schedule-breaking surprises.
"The switchgear arrived and there was no permit. We lost three weeks."
— Plant Manager, Gary, IN (pre-checklist client)
Full PDF version includes NEC references and vendor lead-time tracker
Secondary Path
Request a Site Walk
Before any proposal, I walk the facility. 60–90 minutes on-site. No charge. Brings up the questions a phone call misses.